Erratum to: Modeling preventive maintenance of manufacturing processes with probabilistic Boolean networks with interventions (Journal of Intelligent Manufacturing, (2018), 29, 8, (1941-1952), 10.1007/s10845-016-1226-x)

  1. Rivera Torres, P.J.
  2. Serrano Mercado, E.I.
  3. Llanes Santiago, O.
  4. Anido Rifón, L.
Revista:
Journal of Intelligent Manufacturing

ISSN: 1572-8145 0956-5515

Ano de publicación: 2018

Volume: 29

Número: 8

Páxinas: 1953

Tipo: Errata

DOI: 10.1007/S10845-017-1321-7 GOOGLE SCHOLAR lock_openAcceso aberto editor