Erratum to: Modeling preventive maintenance of manufacturing processes with probabilistic Boolean networks with interventions (Journal of Intelligent Manufacturing, (2018), 29, 8, (1941-1952), 10.1007/s10845-016-1226-x)
- Rivera Torres, P.J.
- Serrano Mercado, E.I.
- Llanes Santiago, O.
- Anido Rifón, L.
ISSN: 1572-8145, 0956-5515
Ano de publicación: 2018
Volume: 29
Número: 8
Páxinas: 1953
Tipo: Errata